In celebration of the 30th anniversary of the independence of the Republic of Kazakhstan, the opening ceremony of the "Atameken" Cultural Palace took place in Uralsk as part of the "Ruhani Zhangyru" program.
On October 8, 2021, the doors of this magnificent building, covering an area of 20,000 square meters, were opened. It includes a grand auditorium with over 900 seats, a large rotating stage that rotates 360 degrees, a 400-square-meter orchestra pit, a spacious hall, conference rooms, meeting halls, an exhibition center, rooms for creative activities, sports, and more.
The team of MEK-Astana made a significant contribution to the creation of this modern cultural palace. We supplied, installed, and commissioned three industrial uninterruptible power supplies (UPS) from the well-known German manufacturer AEG Solutions, model AEG Protect 4.33 with a power rating of 300 kVA each, operating in an N+1 configuration, with a total capacity of 900 kVA.
The choice of the industrial series was determined by the type of load to be powered. The uninterruptible power supply from the UPS is distributed to smoke extraction systems, alarms, some elevator installations, lifts for people with disabilities, emergency lighting systems, control cabinets for diesel generators and air conditioning systems, server rooms, pump equipment cabinets, gate drives, and more.In addition to the UPS units, MEK-Astana engineers installed AEG Solutions battery cabinets, EXIDE batteries (Germany), and Janitza power quality analyzers (Germany).
We are confident that the equipment installed by us will operate for many years with timely professional care and technical maintenance.