In the last week of 2023, the team of the Western branch of MEK-Astana LLP successfully commissioned a new solar (photovoltaic) station with a capacity of 100 kW.
From the beginning of 2024, the first kilowatt-hours of “green energy” enter the network of the Customer’s facility.
We have selected the optimal set of equipment for a photovoltaic station and selected a basic ground metal structure with an optimal angle of inclination for placing photovoltaic panels - as the Customer’s space allows.
Main components of the station:
-
192 JINKO solar panels
-
4 inverters and 1 controller from KEHUA
-
4 Janitza power supply quality analyzers
-
Ground metal structure
-
Solar power cable from LAPP
-
AC cables, electrical cabinets, etc.
We can “bake” such basic simple solar stations like pies - in batches, installing them anywhere in Kazakhstan.
We are ready to design and implement more complex technical solutions: autonomous hybrid power supply units, stations with storage systems, etc.
We also know how to build photovoltaic stations on complex structures (sheds, parking lots, roofs).